PWHT / Stress reliving Procedure
1.0 Scope:-
This
describes the Procedures Provide information for heat treatment (Stress
relieving only) for Carbon steel, alloy steel.
2.0 Reference Codes & Specification:-
• ASME
Section VIII Div.1
• AWS
D1.1
• Railway
Specification.
•
Manufacturing Drawing.
3.0 Responsibilities & Duties:-
• To
ensure that all heat treatment in accordance with specified standards &
applicable quality control criteria.
• Heat treatment shall be performed by employees who are adequately qualified.
• Assures
facilities/equipment is properly maintained.
• Assures
equipment like Furnace, thermocouples, temperature recording & controlling
devices are calibrated.
4.0 Furnace loading:-
•
Material shall be loaded in the Furnace in a manner that provides sufficient
spacing to ensure that there is adequate furnace airflow & circulation.
• Material
shall not be placed on the furnace hearth (floor). Material shall be placed on
racks or supports. Long part to be supported, as needed to prevent sagging.
•
Complete furnace loads should be inspected to ensure that doors/openings are
properly sealed.
• Furnace atmosphere shall be controlled so as to avoid
excessive oxidation during heating & holding Period.
• During heating, no temperature variation exceeds 14 degrees C
• During holding no temperature variation between the highest
& lowest temperatures exceeding14 degrees C is allowed.
• The Heat treatment operation (Heating rate, holding time /
temperature & Cooling rate shall be in accordance with the Stress reliving / PWHT specification.
5.0 Thermocouple Placement:-
• Thermocouples Locations
attached in Rectangular furnace (Working Zone)
6.0 Inspection & Records:-
• Ensure the Heat treatment chart
shall indicate the Job identification / Joint Identification to be covered in the PWHT cycle & Chart shall be
endorsed by Authorized representative & Heat treatment Personal along with a date.
• Visual & dimensional Check for possible deformation & loss of
identification.
• Check there is no deformation or Visual defects on the structure being
Heat-treated.
• NDE on joints to be performed after 48 hours
PWHT / Stress relieving.
PWHT / Stress reliving
|
||||
Job no.
|
||||
Description
|
||||
Material Specification
|
||||
Nominal Thickness
|
||||
WPS no.
|
||||
Method of Heating
|
Electric Furnace
|
|||
Loading & Unloading Temperature
|
300oC Max
|
|||
Heating Rate
|
80-120oC/Hr
|
|||
Cooling Rate
|
80-120oC/Hr
|
|||
Soaking Temperature
|
600 ± 20°C and Minimum holding time
shall be as per below mention table.
|
|||
Weld Metal Thickness in mm
|
||||
Holding Time
|
≤ 6mm
|
Above 6mm to 50 mm
|
Above 50mm
|
|
15 minutes
|
15 minutes for each 6mm or fraction thereof
|
2 hrs plus 15 minutes for each additional 25 mm or
fraction thereof over 50mm
|